2022 Supermarket Gondola Metal Display Rack Light & Heavy Duty Steel Shelf Equipment Modern Appearance Hot Selling for Stores

Product Description

Product Banner
Product Intro
Product Information
Product Specs
GOOD SHELF
RD-36#
Place of Origin China Material Q235B STEEL
Color Customized Capacity 120KG/LAYER
STYLE LONG WIDE HIGH
Single side shelf 600 / 700 / 900 300 / 350 1150 / 1350 / 1550 / 1750 / 1950 / 2150
Double sided shelf 600 / 700 / 900 450
We Can Customize The Color And Size
Product Customization
Product Details
Detail Image 1
  • The main frame has one more column than the sub frame, which can be used alone.
  • The sub frame needs to be used with the main frame. A main frame can be combined with multiple subframes to form a row, which saves cost and is more stable.
  • Conventional matching: one main frame + N sub frames + two ends. Both sides of the double-sided main and sub frames can be connected to the end frame.
Detail Image 2
Detail Image 3
Combination & Accessories Info

Shelves can be combined with a variety of accessories, such as hooks, floor cabinets, light tubes, light boxes and billboards. For more combinations, you can consult our customer service.

Design Case
Case 1
Case 2
Case 3
Case 4
Case 5
Case 6
Case 7
Case 8
Design Case Summary
HOT Product
VR Showroom
Trade show
Trade Show Booth
Certificate
Certificates
Company Profile
Company Introduction

We make excellent quality, unique design, practical function, enough variety as the selling point. The company won the trust and support from our extensive customers.

Profile Details 1

For the purpose of "Integrity management, keep improving and innovative, win-win cooperation, professional production, high quality at low price, service first".

Profile Details 2
Company Information
Factory Overview
FAQ
Q Are you a trading company or a factory?
We are a factory. The factory covers an area of more than 16,000 square meters. Welcome to visit the factory.
Q What are your terms of payment?
A: T/T 30% in advance, balance against B/L copy.
Q What are your terms of delivery?
A: Usually FOB.
Q How about your delivery time?
A: Generally, 10 to 20 days after receiving the advance payment and artworks. The specific delivery time depends on the terms and the quantity of your order.
Q What is the material being used for your products?
A: Our material is cold rolled steel.
Q Is custom size available?
A: Yes, we are good at producing products according to your design.

Related Products